CuVoodoo

the sorcery of copper

User Tools

Site Tools


spark_counter

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
spark_counter [2017/01/23 18:07]
kingkevin [peacefair PZEM-004] better pictures
spark_counter [2017/02/03 16:34] (current)
kingkevin mention spark abacus
Line 13: Line 13:
 {{:​spark_counter:​dsc02371.jpg?​0x300|complete spark counter}} {{:​spark_counter:​dsc02371.jpg?​0x300|complete spark counter}}
  
-**warning: the electricity meter I am presenting will only work for 1 phase 2 wires power distribution systems. I have a 3 phases ​wires system and I am doing it wrong.**+**warning: the electricity meter I am presenting will only work for 1-phase 2-wire power distribution systems. I have a 3-phase ​4-wire system and I was doing it wrong. This has been fixed with the [[spark abacus]].**
  
 ====== peacefair PZEM-004 ====== ====== peacefair PZEM-004 ======
spark_counter.txt ยท Last modified: 2017/02/03 16:34 by kingkevin