Line 15: Line 15:
   * run rats nest to ensure all is connected   * run rats nest to ensure all is connected
   * run DRC   * run DRC
 +  * ensure non-plated through hole (e.g. mounting hole) have copper clearance (else it will be manufactured as plated hole)
   * ensure outline is present and uses 0.1 mm lines   * ensure outline is present and uses 0.1 mm lines
   * ensure the text next to the LEDs, header pins, and test points are the right ones   * ensure the text next to the LEDs, header pins, and test points are the right ones