This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
checklist [2022/03/23 09:24] – [after designing] kingkevin | checklist [2024/01/07 17:49] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 15: | Line 15: | ||
* run rats nest to ensure all is connected | * run rats nest to ensure all is connected | ||
* run DRC | * run DRC | ||
+ | * ensure non-plated through hole (e.g. mounting hole) have copper clearance (else it will be manufactured as plated hole) | ||
* ensure outline is present and uses 0.1 mm lines | * ensure outline is present and uses 0.1 mm lines | ||
* ensure the text next to the LEDs, header pins, and test points are the right ones | * ensure the text next to the LEDs, header pins, and test points are the right ones |