CuVoodoo

the sorcery of copper

User Tools

Site Tools


checklist

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Last revisionBoth sides next revision
checklist [2022/03/23 09:24] – [after designing] kingkevinchecklist [2022/05/18 09:59] – add npth kingkevin
Line 15: Line 15:
   * run rats nest to ensure all is connected   * run rats nest to ensure all is connected
   * run DRC   * run DRC
 +  * ensure non-plated through hole (e.g. mounting hole) have copper clearance (else it will be manufactured as plated hole)
   * ensure outline is present and uses 0.1 mm lines   * ensure outline is present and uses 0.1 mm lines
   * ensure the text next to the LEDs, header pins, and test points are the right ones   * ensure the text next to the LEDs, header pins, and test points are the right ones
checklist.txt · Last modified: 2024/01/07 17:49 by 127.0.0.1